Cty TNHH tư vấn XD Hưng Lợi

Found: 13:50 18/10/2024
Certificate of Capacity in construction
00001219
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address
Số 1-2 Bùi Viện, phường Bình Khánh, thành phố Long Xuyên, tỉnh An Giang, Việt Nam
Moderator
Representative
Đỗ Văn Tùng  
Position
Giám đốc
Tax code/ Establish decision no.
1600455924
Certification date
05/10/2021
Granting agencies
Sở Kế hoạch và Đầu tư tỉnh An Giang

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
ANG-00001219
Thiết kế, thẩm tra thiết kế xây dựng công trình
Hạ tầng kỹ thuật (xử lý CTR)
III
09/09/2034
2
ANG-00001219
Tư vấn giám sát lắp đặt thiết bị công trình

III
09/09/2034

This construction organization is also a contractor. The results of data analysis for contractors HUNG LOI CONSTRUCTION CONSULTANCY COMPANY LIMITED are as follows:

  • Participated in 206 bidding packages, of which 179 were won, 23 were lost, 2 are pending results, and 2 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 1.53% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 87.96% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: An Giang (114), Cần Thơ (3), Đồng Tháp (1), Vĩnh Long (1), Undefined (87)
  • Provinces before the merger where the contractor has participated in bidding: An Giang (45), Sóc Trăng (3), Đồng Tháp (1), Trà Vinh (1), Undefined (156)
  • Has relationships with 40 Bid Solicitors
  • Has competed against 47 contractors in 45 bidding packages, won 18 packages, lost 23 packages, 2 are pending results, and 2 were canceled.
  • Has collaborated with 14 contractors in 24 bidding packages, won 14 packages, lost 8 packages, 0 are pending results, and 2 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This construction organization is also the Procuring Entity. The results of data analysis for the procuring entity HUNG LOI CONSTRUCTION CONSULTANCY COMPANY LIMITED are as follows:
  • Published contractor selection plan of 0 project with total 0 bidding packages.
  • Invitation for bids 12 package (with 14 bidding notice), conduct prequalification 0 package.
  • Results announced of 7 packages, cancel bids 0 packages (among the packages above).
  • Yes 0 packages with results without Tender/Prequalified notification .
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second