No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 |
TTH-00011359 |
Lập quy hoạch xây dựng |
III |
05/08/2029 |
|
3 |
TTH-00011359 |
Thi công xây dựng công trình |
Dân dụng |
III |
05/08/2029 |
4 |
TTH-00011359 |
Thi công xây dựng công trình |
Nông nghiệp và phát triển nông thôn |
III |
05/08/2029 |
This construction organization is also a contractor. The results of data analysis for contractors NHAN TIN CONSTRUCTION COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 77 bidding packages, of which 58 were won, 18 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 65.92% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.08% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Thừa Thiên - Huế (59), (5), Đồng Tháp (2), Thanh Hoá (2), Lào Cai (1), Hưng Yên (1), Bắc Ninh (1), Hải Phòng (1), Đà Nẵng (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding: Thừa Thiên - Huế (17), Thanh Hoá (2), Tiền Giang (1), Lào Cai (1), Đồng Tháp (1), Hưng Yên (1), Bắc Giang (1), Hải Dương (1), Undefined (52)
- Has relationships with 36 Bid Solicitors
- Has competed against 49 contractors in 24 bidding packages, won 5 packages, lost 18 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 8 contractors in 13 bidding packages, won 4 packages, lost 9 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
blockquote>
- Published contractor selection plan of 46 project with total 50 bidding packages.
- Invitation for bids 47 package (with 53 bidding notice), conduct prequalification 0 package.
- Results announced of 43 packages, cancel bids 0 packages (among the packages above).
- Yes 0 packages with results without Tender/Prequalified notification .