No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 |
VIP-00006174 |
Thi công xây dựng công trình |
Công nghiệp (Đường dây và trạm biến áp) Đường dây và trạm biến áp |
III |
08/12/2029 |
3 |
VIP-00006174 |
Thi công xây dựng công trình |
Thi công xây dựng công trình dân dụng |
II |
29/11/2022 |
This construction organization is also a contractor. The results of data analysis for contractors NINH BINH CONSTRUCTION AND TRADING COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 106 bidding packages, of which 87 were won, 11 were lost, 7 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 68.97% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.42% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Phú Thọ (52), TP.Hồ Chí Minh (3), Hà Nội (2), Lào Cai (2), Lạng Sơn (2), Thái Nguyên (2), Hải Phòng (2), Tuyên Quang (1), Đà Nẵng (1), Tây Ninh (1), Đồng Nai (1), Undefined (37)
- Provinces before the merger where the contractor has participated in bidding: Vĩnh Phúc (50), Bình Dương (3), Hòa Bình (2), Hà Nội (2), Lào Cai (2), Lạng Sơn (2), Bắc Cạn (2), Hải Dương (2), Tuyên Quang (1), Quảng Nam (1), Long An (1), Đồng Nai (1), Undefined (37)
- Has relationships with 48 Bid Solicitors
- Has competed against 103 contractors in 42 bidding packages, won 30 packages, lost 10 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 52 contractors in 40 bidding packages, won 29 packages, lost 9 packages, 1 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.