Công ty TNHH Xây dựng và Phát triển An Dũng

Found: 20:00 24/09/2022
Certificate of Capacity in construction
00008023
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address
25/4B Trương Công Định, TP.Buôn Ma Thuột, tỉnh Đắk Lắk
Moderator
Representative
Trần Văn Dũng  
Position
Giám đốc
Tax code/ Establish decision no.
6001594406
Certification date
27/12/2017
Granting agencies
Sở Kế hoạch & Đầu tư Đắk Lắk

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
DAL-00008023
Thi công xây dựng công trình
hạ tầng kỹ thuật
III
04/08/2030
2
DAL-00008023
Giám sát thi công xây dựng công trình
hạ tầng kỹ thuật
III
04/08/2030
3
DAL-00008023
Thiết kế, thẩm tra thiết kế xây dựng công trình
giao thông
cầu, đường bộ
III
23/02/2031
4
DAL-00008023
Giám sát thi công xây dựng công trình
giao thông
cầu, đường bộ
III
23/02/2031
5
DAL-00008023
Thiết kế, thẩm tra thiết kế xây dựng công trình
dân dụng
III
18/10/2031
6
DAL-00008023
Thiết kế, thẩm tra thiết kế xây dựng công trình
công nghiệp
III
18/10/2031
7
DAL-00008023
Thiết kế, thẩm tra thiết kế xây dựng công trình
hạ tầng kỹ thuật
III
18/10/2031
8
DAL-00008023
Quản lý dự án đầu tư xây dựng
dân dụng
III
18/10/2031
9
DAL-00008023
Quản lý dự án đầu tư xây dựng
công nghiệp
III
18/10/2031
10
DAL-00008023
Thiết kế, thẩm tra thiết kế xây dựng công trình
cấp thoát nước
III
24/01/2023
11
DAL-00008023
Giám sát thi công xây dựng công trình
dân dụng
III
24/01/2023
12
DAL-00008023
Giám sát thi công xây dựng công trình
công nghiệp
III
24/01/2023
13
DAL-00008023
Khảo sát xây dựng
Khảo sát địa hình công trình xây dựng
III
12/04/2023

This construction organization is also a contractor. The results of data analysis for contractors CÔNG TY TNHH XÂY DỰNG VÀ PHÁT TRIỂN AN DŨNG are as follows:

  • Participated in 216 bidding packages, of which 215 were won, 1 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 80.85% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 98.18% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Đắk Lắk (140), Lâm Đồng (9), Undefined (67)
  • Provinces before the merger where the contractor has participated in bidding: Đắk Lắk (10), Undefined (206)
  • Has relationships with 75 Bid Solicitors
  • Has competed against 13 contractors in 9 bidding packages, won 8 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 17 contractors in 15 bidding packages, won 15 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This construction organization is also the Procuring Entity. The results of data analysis for the procuring entity CÔNG TY TNHH XÂY DỰNG VÀ PHÁT TRIỂN AN DŨNG are as follows:
  • Published contractor selection plan of 13 project with total 47 bidding packages.
  • Invitation for bids 80 package (with 94 bidding notice), conduct prequalification 0 package.
  • Results announced of 83 packages, cancel bids 0 packages (among the packages above).
  • Yes 9 packages with results without Tender/Prequalified notification .
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second