CÔNG TY TNHH XÂY DỰNG NGUYỄN MAI

Found: 23:40 05/09/2024
Certificate of Capacity in construction
00072536
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address
Khóm 4, thị trấn Đầm Dơi, huyện Đầm Dơi, tỉnh Cà Mau
Moderator
Representative
NGUYỄN THỊ HỒNG NHUNG  
Position
Giám đốc
Tax code/ Establish decision no.
2001368417
Certification date
18/04/2023
Granting agencies
Sở Kế hoạch và Đầu tư tỉnh Cà Mau

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
BXD-00072536
Thi công xây dựng công trình
Dân dụng, Công nghiệp (phần xây dựng), Giao thông (đường bộ, cầu đường bộ), Thủy lợi, Hạ tầng kỹ thuật
III
25/04/2033

This construction organization is also a contractor. The results of data analysis for contractors CÔNG TY TNHH XÂY DỰNG NGUYỄN MAI are as follows:

  • Participated in 13 bidding packages, of which 10 were won, 3 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 68.73% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 96.27% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Cà Mau (13)
  • Provinces before the merger where the contractor has participated in bidding: Cà Mau (13)
  • Has relationships with 2 Bid Solicitors
  • Has competed against 15 contractors in 10 bidding packages, won 7 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 3 contractors in 7 bidding packages, won 7 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.