No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 |
CAT-00085935 |
Thi công lắp đặt thiết bị vào công trình |
Thi công lắp đặt thiết bị vào công trình. |
III |
30/12/2034 |
This construction organization is also a contractor. The results of data analysis for contractors CÔNG TY TNHH THIẾT BỊ GIÁO DỤC TRƯỜNG THỊNH are as follows:
You need to Login or Sign up to view all informations.
- Participated in 71 bidding packages, of which 27 were won, 39 were lost, 2 are pending results, and 3 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 69.1% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.72% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: TP.Hồ Chí Minh (24), Bà Rịa - Vũng Tàu (9), Lâm Đồng (7), Gia Lai (6), An Giang (6), Bình Dương (3), Bình Định (2), Đồng Nai (2), Sóc Trăng (2), Kon Tum (1), Quảng Ngãi (1), Đồng Tháp (1), Bạc Liêu (1), Khánh Hòa (1), Phú Yên (1), Undefined (4)
- Has relationships with 43 Bid Solicitors
- Has competed against 220 contractors in 60 bidding packages, won 17 packages, lost 39 packages, 2 are pending results, and 2 were canceled.
- Has collaborated with 20 contractors in 23 bidding packages, won 5 packages, lost 15 packages, 1 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.