Công ty TNHH SORICOM

Found: 22:06 05/09/2024
Certificate of Capacity in construction
00008087
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address
Đường Chu Văn Thịnh, tổ 01, phường Tô Hiệu, thành phố Sơn La
Moderator
Representative
Số 107, đường Chu Văn Thịnh, tổ 01, phường Tô Hiệu, thành phố Sơn La, tỉnh Sơn La  
Position
Chủ tịch HĐTV kiêm Giám đốc
Tax code/ Establish decision no.
5500214880
Certification date
01/01/2001
Granting agencies
Sở Kế hoạch và đầu tư tỉnh Sơn La

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
SOL-00008087
Thi công xây dựng công trình
Thi công công tác xây dựng công trình dân dụng
III
22/11/2033
2
SOL-00008087
Thi công xây dựng công trình
Thi công công tác xây dựng công trình nhà công nghiệp
III
22/11/2033
3
SOL-00008087
Thi công xây dựng công trình
Thi công công tác xây dựng công trình giao thông: Đường bộ; Cầu
III
22/11/2033
4
SOL-00008087
Thi công xây dựng công trình
Thi công công tác xây dựng công trình hạ tầng kỹ thuật: Cấp nước, thoát nước
III
22/11/2033
5
SOL-00008087
Thi công xây dựng công trình
Thi công công tác xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn: Thuỷ lợi, đê điều
III
22/11/2033
6
SOL-00008087
Tư vấn giám sát thi công xây dựng công trình
Tư vấn giám sát công tác xây dựng công trình dân dụng
III
22/11/2033
7
SOL-00008087
Tư vấn giám sát thi công xây dựng công trình
Tư vấn giám sát công tác xây dựng công trình công nghiệp
III
22/11/2033
8
SOL-00008087
Tư vấn giám sát thi công xây dựng công trình
Tư vấn giám sát công tác xây dựng công trình hạ tầng kỹ thuật
III
22/11/2033
9
SOL-00008087
Tư vấn giám sát thi công xây dựng công trình
Tư vấn giám sát công tác xây dựng công trình giao thông
III
22/11/2033
10
SOL-00008087
Tư vấn giám sát thi công xây dựng công trình
Tư vấn giám sát công tác xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn
III
22/11/2033

This construction organization is also a contractor. The results of data analysis for contractors SORICOM LIMITTED COMPANY are as follows:

  • Participated in 24 bidding packages, of which 23 were won, 1 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 50.41% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 99% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Sơn La (12), Lào Cai (1), Undefined (11)
  • Provinces before the merger where the contractor has participated in bidding: Sơn La (12), Lào Cai (1), Undefined (11)
  • Has relationships with 10 Bid Solicitors
  • Has competed against 17 contractors in 6 bidding packages, won 5 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 18 contractors in 8 bidding packages, won 7 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second