CÔNG TY TNHH MTV ĐĂK LINH KON TUM

Found: 22:33 05/09/2024
Certificate of Capacity in construction
00015009
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address (after merge)
Số 34 Trần Khắc Trân
Moderator
Address (before merger)
Số 34 Trần Khắc Trân, Phường Duy Tân, thành phố Kon Tum, tỉnh Kon Tum
Representative
PHAN HỮU TRỊ  
Position
Chủ tịch công ty kiêm Giám đốc
Tax code/ Establish decision no.
6101245712
Certification date
29/05/2018
Granting agencies
Sở Kế hoạch và Đầu tư tỉnh Kon Tum

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
HCM-00015009
Khảo sát xây dựng
Khảo sát địa hình
III
15/09/2033
2
HCM-00015009
Thiết kế, thẩm tra thiết kế xây dựng công trình
Giao thông
đường bộ
III
15/09/2033
3
HCM-00015009
Thi công xây dựng công trình
Thi công công tác xây dựng công trình Dân dụng
II
15/09/2033
4
HCM-00015009
Thi công xây dựng công trình
Thi công công tác xây dựng công trình Nhà công nghiệp
III
15/09/2033
5
HCM-00015009
Thi công xây dựng công trình
Thi công công tác xây dựng công trình hạ tầng kỹ thuật
cấp nước, thoát nước
III
15/09/2033
6
HCM-00015009
Thi công xây dựng công trình
Thi công công tác xây dựng công trình giao thông
đường bộ
III
15/09/2033
7
HCM-00015009
Thi công xây dựng công trình
Thi công công tác xây dựng công trình phục vụ nông nghiệp và phát triển nông thôn
thủy lợi, đê điều
III
15/09/2033
8
HCM-00015009
Tư vấn giám sát công tác xây dựng công trình
Hạ tầng kỹ thuật
III
15/09/2033
9
HCM-00015009
Tư vấn giám sát công tác xây dựng công trình
Giao thông
đường bộ
III
15/09/2033
10
HCM-00015009
Thiết kế, thẩm tra thiết kế xây dựng công trình
Dân dụng
III
20/10/2033
11
HCM-00015009
Tư vấn giám sát công tác xây dựng công trình
Dân dụng
III
20/10/2033

This construction organization is also a contractor. The results of data analysis for contractors CÔNG TY TNHH MTV ĐĂK LINH KON TUM are as follows:

  • Participated in 8 bidding packages, of which 5 were won, 3 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 87.98% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Quảng Ngãi (3), Undefined (5)
  • Provinces before the merger where the contractor has participated in bidding: Kon Tum (3), Undefined (5)
  • Has relationships with 3 Bid Solicitors
  • Has competed against 9 contractors in 3 bidding packages, won 0 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 2 contractors in 2 bidding packages, won 0 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 13 bidding packages with 8 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second