CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG ĐẶNG NHẬT KHOA

Found: 22:36 25/06/2021
Certificate of Capacity in construction
00043120
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address
Số 240/4, đường Lưu Hữu Phước, phường 8, thành phố Cà Mau, tỉnh Cà Mau
Moderator
Representative
ĐẶNG HOÀNG HƯNG  
Position
Giám đốc
Tax code/ Establish decision no.
2001331865
Certification date
30/06/2020
Granting agencies
Sở Kế hoạch và Đầu tư tỉnh Cà Mau

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
CAM-00043120
Thiết kế, thẩm tra thiết kế xây dựng công trình
Dân dụng, Công nghiệp
III
16/07/2030
3
CAM-00043120
Giám sát thi công xây dựng công trình
Dân dụng, Công nghiệp, Giao thông, Thủy lợi
III
16/07/2030
4
CAM-00043120
Giám sát thi công xây dựng công trình
Hạ tầng kỹ thuật
cấp, thoát nước
III
16/07/2030
5
CAM-00043120
Thi công xây dựng công trình
Dân dụng, Thủy lợi
III
16/07/2030
6
CAM-00043120
Thi công xây dựng công trình
Công nghiệp
phần xây dựng
III
16/07/2030
7
CAM-00043120
Thi công xây dựng công trình
Giao thông
đường bộ, cầu đường bộ
III
16/07/2030
8
CAM-00043120
Thi công xây dựng công trình
Hạ tầng kỹ thuật
cấp, thoát nước
III
16/07/2030

This construction organization is also a contractor. The results of data analysis for contractors CÔNG TY TNHH MTV XÂY DỰNG ĐẶNG NHẬT KHOA are as follows:

  • Participated in 101 bidding packages, of which 38 were won, 57 were lost, 1 are pending results, and 5 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 60.86% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 94.96% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Cà Mau (99), Undefined (2)
  • Provinces before the merger where the contractor has participated in bidding: Cà Mau (86), Bạc Liêu (1), Undefined (14)
  • Has relationships with 30 Bid Solicitors
  • Has competed against 75 contractors in 82 bidding packages, won 21 packages, lost 57 packages, 1 are pending results, and 3 were canceled.
  • Has collaborated with 6 contractors in 26 bidding packages, won 11 packages, lost 14 packages, 1 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second