Công ty TNHH Đầu tư xây dựng Phước Nguyễn

Found: 15:40 16/11/2021
Certificate of Capacity in construction
00058549
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address
278/32/1F đường Tầm Vu, phường Hưng Lợi, quận Ninh Kiều, thành phố Cần Thơ
Moderator
Representative
Nguyễn Phước Nhâm  
Position
Giám đốc
Tax code/ Establish decision no.
0314940766
Certification date
22/03/2018
Granting agencies
Sở Kế hoạch và Đầu tư thành phố Cần Thơ

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
DOT-00058549
Giám sát thi công xây dựng công trình
Dân dụng, công nghiệp
III
15/11/2031
3
DOT-00058549
Thi công xây dựng công trình
Giao thông (cầu, đường bộ)
III
15/11/2031

This construction organization is also a contractor. The results of data analysis for contractors PHUOC NGUYEN CONSTRUCTION INVESTMENT COMPANY LIMITED are as follows:

  • Participated in 87 bidding packages, of which 71 were won, 14 were lost, 2 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 57.13% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 97.04% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Cần Thơ (31), Đồng Tháp (13), Vĩnh Long (9), TP.Hồ Chí Minh (4), An Giang (2), Cà Mau (2), Lâm Đồng (2), Gia Lai (2), Đồng Nai (1), Tây Ninh (1), Đắk Lắk (1), Undefined (21)
  • Provinces before the merger where the contractor has participated in bidding: Cần Thơ (12), Tiền Giang (4), TP.Hồ Chí Minh (4), Sóc Trăng (3), Hậu Giang (3), An Giang (2), Bạc Liêu (2), Bình Định (2), Lâm Đồng (1), Đồng Tháp (1), Đồng Nai (1), Bến Tre (1), Tây Ninh (1), Vĩnh Long (1), Đắk Nông (1), Đắk Lắk (1), Undefined (51)
  • Has relationships with 16 Bid Solicitors
  • Has competed against 20 contractors in 25 bidding packages, won 10 packages, lost 14 packages, 1 are pending results, and 0 were canceled.
  • Has collaborated with 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second