No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 |
HAN-00035477 |
Giám sát thi công xây dựng công trình |
Công nghiệp Đường dây & TBA |
III |
08/01/2030 |
3 |
HAN-00035477 |
Thi công xây dựng công trình |
Dân dụng |
III |
08/01/2030 |
4 |
HAN-00035477 |
Thi công xây dựng công trình |
Hạ tầng kỹ thuật |
III |
08/01/2030 |
5 |
HAN-00035477 |
Thiết kế, thẩm tra thiết kế xây dựng công trình |
Công nghiệp Đường dây & TBA |
III |
21/01/2030 |
This construction organization is also a contractor. The results of data analysis for contractors MITEC COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 196 bidding packages, of which 80 were won, 100 were lost, 6 are pending results, and 10 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 33.44% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 92.56% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Thanh Hoá (77), Hưng Yên (50), Quảng Ninh (25), Hải Phòng (12), Vĩnh Long (5), Thái Nguyên (4), Hà Nội (2), Lâm Đồng (2), Bắc Ninh (2), Hà Tĩnh (1), TP.Hồ Chí Minh (1), Nghệ An (1), Đà Nẵng (1), Undefined (16)
- Provinces before the merger where the contractor has participated in bidding: Thanh Hoá (77), Thái Bình (47), Quảng Ninh (25), Hải Phòng (10), Trà Vinh (5), Thái Nguyên (3), Hà Nội (2), Hải Dương (2), Bình Thuận (2), Bắc Giang (2), Hưng Yên (2), Hà Tĩnh (1), TP.Hồ Chí Minh (1), Nghệ An (1), Đà Nẵng (1), Undefined (18)
- Has relationships with 25 Bid Solicitors
- Has competed against 231 contractors in 168 bidding packages, won 53 packages, lost 100 packages, 6 are pending results, and 9 were canceled.
- Has collaborated with 16 contractors in 25 bidding packages, won 10 packages, lost 15 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.