CÔNG TY TNHH CÔNG NGHỆ CAO NĂNG LƯỢNG MẶT TRỜI G7

Found: 13:01 24/06/2021
Certificate of Capacity in construction
00034916
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address (after merge)
257 Võ Thị Sáu, KP. 1
Moderator
Address (before merger)
257 Võ Thị Sáu, KP. 1, Phường Thống Nhất, Thành phố Biên Hoà, Tỉnh Đồng Nai, Việt Nam
Representative
Phan Văn Bình  
Position
Chủ tịch Hội đồng thành viên
Tax code/ Establish decision no.
3603455267
Certification date
04/04/2017
Granting agencies
Sở kế hoạch đầu tư Tỉnh Đồng Nai

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
HAN-00034916
Thi công xây dựng công trình
Dân dụng
III
24/12/2029
3
HAN-00034916
Thi công xây dựng công trình
Hạ tầng kỹ thuật
III
24/12/2029
4
HAN-00034916
Thi công xây dựng công trình
Giao thông Cầu, đường bộ
III
08/01/2030
5
HAN-00034916
Thi công xây dựng công trình
NN & PTNT
III
08/01/2030
6
HAN-00034916
Thiết kế, thẩm tra thiết kế xây dựng công trình
Dân dụng
III
06/02/2030
7
HAN-00034916
Thiết kế, thẩm tra thiết kế xây dựng công trình
Công nghiệp nhẹ
III
06/02/2030
8
HAN-00034916
Giám sát thi công xây dựng công trình
Công nghiệp nhẹ
III
06/02/2030
9
HAN-00034916
Thiết kế, thẩm tra thiết kế xây dựng công trình
Giao thông Cầu, đường bộ
III
10
HAN-00034916
Thiết kế, thẩm tra thiết kế xây dựng công trình
Hạ tầng kỹ thuật
III

This construction organization is also a contractor. The results of data analysis for contractors G7 HIGH TECH SOLAR ENERGY COMPANY LIMITED are as follows:

  • Participated in 3 bidding packages, of which 2 were won, 1 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 67.86% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 72.85% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Đồng Nai (2), Undefined (1)
  • Provinces before the merger where the contractor has participated in bidding: Đồng Nai (2), Undefined (1)
  • Has relationships with 2 Bid Solicitors
  • Has competed against 17 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 0 bidding packages with 0 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second