Công ty CP Kiểm định và tư vấn Đầu tư xây dựng Sông Bồ

Found: 08:47 22/06/2021
Certificate of Capacity in construction
00007945
Province
Address
B19, Phan Chu Trinh, Quang Vinh, Biên Hòa, Đồng Nai
Moderator
Representative
Lê Ngọc Hiếu  
Position
Giám đốc
Tax code/ Establish decision no.
3600992094
Certification date
28/03/2008
Granting agencies
Sở Kế hoạch và Đầu tư Đồng Nai

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
DON-00007945
Thi công xây dựng công trình
Dân dụng (có k/cấu dạng nhà)
II
24/10/2029
3
DON-00007945
Thi công xây dựng công trình
Giao thông (đường bộ)
III
05/02/2023
4
DON-00007945
Giám sát thi công xây dựng công trình
Dân dụng
III
05/02/2023
5
DON-00007945
Quản lý dự án đầu tư xây dựng
dân dụng
II
20/12/2028
6
DON-00007945
Giám sát công tác xây dựng công trình
Công nghiệp (nhẹ)
III
11/04/2029
7
DON-00007945
Thi công xây dựng công trình
Hạ tầng kỹ thuật (cấp- thoát nước)
III
29/05/2029
8
DON-00007945
Giám sát lắp đặt thiết bị công trình
Giám sát lắp đặt thiết bị cơ - điện vào công trình (trừ thiết bị công nghệ)
trừ thiết bị công nghệ
III
23/12/2029
9
DON-00007945
Giám sát lắp đặt thiết bị công trình
Dân dụng
trừ thiết bị công nghệ
III
23/12/2029
10
DON-00007945
Giám sát lắp đặt thiết bị công trình
Công nghiệp
trừ thiết bị công nghệ
III
23/12/2029
11
DON-00007945
Giám sát thi công xây dựng công trình
Hạ tầng kỹ thuật
III
05/02/2028

This construction organization is also a contractor. The results of data analysis for contractors CÔNG TY CỔ PHẦN KIỂM ĐỊNH VÀ TƯ VẤN ĐẦU TƯ XÂY DỰNG SÔNG BỒ are as follows:

  • Participated in 59 bidding packages, of which 40 were won, 18 were lost, 0 are pending results, and 1 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 90.8% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 98.03% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces participated in the bidding: Đồng Nai (29), Bình Dương (3), Undefined (27)
  • Has relationships with 27 Bid Solicitors
  • Has competed against 59 contractors in 25 bidding packages, won 6 packages, lost 17 packages, 1 are pending results, and 1 were canceled.
  • Has collaborated with 10 contractors in 12 bidding packages, won 6 packages, lost 6 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This construction organization is also the Procuring Entity. The results of data analysis for the procuring entity CÔNG TY CỔ PHẦN KIỂM ĐỊNH VÀ TƯ VẤN ĐẦU TƯ XÂY DỰNG SÔNG BỒ are as follows:
  • Published contractor selection plan of 76 project with total 443 bidding packages.
  • Invitation for bids 99 package (with 112 bidding notice), conduct prequalification 0 package.
  • Results announced of 79 packages, cancel bids 0 packages (among the packages above).
  • Yes 6 packages with results without Tender/Prequalified notification .
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second