No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 |
BXD-00000475 |
Thi công xây dựng công trình |
Dân dụng, Công nghiệp nhẹ, Hạ tầng kỹ thuật (cấp thoát nước) I |
05/04/2022 |
|
3 |
BXD-00000475 |
Thi công xây dựng công trình |
Dân dụng, Công nghiệp nhẹ, Hạ tầng kỹ thuật (cấp thoát nước) |
I |
05/04/2022 |
4 |
BXD-00000475 |
Thi công xây dựng công trình |
Giao thông đường bộ |
II |
05/04/2022 |
5 |
BXD-00000475 |
Thi công xây dựng công trình |
Giao thông (Đường bộ) |
I |
05/04/2022 |
This construction organization is also a contractor. The results of data analysis for contractors 201 CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 103 bidding packages, of which 60 were won, 36 were lost, 5 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 71% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.74% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Hải Phòng (30), TP.Hồ Chí Minh (15), Hà Nội (9), Đồng Nai (7), Khánh Hòa (7), Quảng Ninh (5), Bắc Ninh (5), Cần Thơ (3), An Giang (2), Lào Cai (2), Vĩnh Long (2), Đắk Lắk (1), Ninh Bình (1), Lâm Đồng (1), Quảng Trị (1), Thừa Thiên - Huế (1), Undefined (11)
- Provinces before the merger where the contractor has participated in bidding: Hải Phòng (18), TP.Hồ Chí Minh (13), Hải Dương (12), Hà Nội (9), Khánh Hòa (7), Quảng Ninh (5), Bắc Giang (5), Bình Phước (4), Đồng Nai (3), Kiên Giang (2), Bình Dương (2), Sóc Trăng (2), Trà Vinh (2), Đắk Lắk (1), Lào Cai (1), Nam Định (1), Bình Thuận (1), Cần Thơ (1), Quảng Trị (1), Thừa Thiên - Huế (1), Undefined (12)
- Has relationships with 70 Bid Solicitors
- Has competed against 312 contractors in 73 bidding packages, won 31 packages, lost 35 packages, 6 are pending results, and 1 were canceled.
- Has collaborated with 107 contractors in 55 bidding packages, won 35 packages, lost 17 packages, 3 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.