CÔNG TY CỔ PHẦN TCICO LAND

Found: 22:42 05/09/2024
Certificate of Capacity in construction
00017207
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address
Số 999, tổ 26, Phường Phan Đình Phùng, thành phố Thái Nguyên, tỉnh Thái Nguyên
Moderator
Representative
Vũ Văn Phong  
Position
Giám đốc
Tax code/ Establish decision no.
4601341065
Certification date
29/06/2017
Granting agencies
Sở Kế hoạch và Đầu tư tỉnh Thái Nguyên

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
THN-00017207
Khảo sát xây dựng
Khảo sát địa chất công trình
II
24/11/2031
2
THN-00017207
Quản lý dự án đầu tư xây dựng
Công nghiệp
II
24/11/2031
3
THN-00017207
Quản lý dự án đầu tư xây dựng
Giao thông
đường bộ
II
24/11/2031
4
THN-00017207
Quản lý dự án đầu tư xây dựng
Thủy lợi
II
24/11/2031
5
THN-00017207
Thiết kế, thẩm tra thiết kế xây dựng công trình
Công nghiệp
II
24/11/2031
6
THN-00017207
Thiết kế, thẩm tra thiết kế xây dựng công trình
Thủy lợi
II
24/11/2031
7
THN-00017207
Giám sát thi công xây dựng công trình
Công nghiệp
II
24/11/2031
8
THN-00017207
Giám sát thi công xây dựng công trình
Giao thông
đường bộ
II
24/11/2031
9
THN-00017207
Giám sát thi công xây dựng công trình
Thủy lợi
III
24/11/2031
10
THN-00017207
Thi công xây dựng công trình
Dân dụng
II
24/11/2031
11
THN-00017207
Thi công xây dựng công trình
Giao thông
đường bộ
III
24/11/2031
12
THN-00017207
Lập thiết kế quy hoạch xây dựng

III
10/07/2033
13
THN-00017207
Thi công xây dựng công trình
Công nghiệp
III
10/07/2033
14
THN-00017207
Thi công xây dựng công trình
Hạ tầng kỹ thuật
III
10/07/2033
15
THN-00017207
Thi công xây dựng công trình
Thủy lợi
III
10/07/2033
16
THN-00017207
Tư vấn quản lý dự án đầu tư xây dựng
Công nghiệp
II
10/07/2033
17
THN-00017207
Thi công xây dựng công trình
Giao thông đường bộ
II
10/07/2033

This construction organization is also a contractor. The results of data analysis for contractors CÔNG TY CỔ PHẦN TCICO LAND are as follows:

  • Participated in 279 bidding packages, of which 264 were won, 9 were lost, 5 are pending results, and 1 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 10% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 95.61% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Thái Nguyên (186), Bắc Ninh (7), Phú Thọ (6), Tuyên Quang (2), Sơn La (2), Quảng Ninh (1), Hải Phòng (1), Nationwide (1), Lào Cai (1), Cao Bằng (1), Undefined (71)
  • Provinces before the merger where the contractor has participated in bidding: Thái Nguyên (55), Quảng Ninh (1), Tuyên Quang (1), Cao Bằng (1), Undefined (221)
  • Has relationships with 102 Bid Solicitors
  • Has competed against 36 contractors in 26 bidding packages, won 15 packages, lost 9 packages, 1 are pending results, and 1 were canceled.
  • Has collaborated with 16 contractors in 19 bidding packages, won 15 packages, lost 3 packages, 0 are pending results, and 1 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second