No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 |
HAP-00039453 |
Thi công xây dựng công trình |
Thi công xây dựng công trình: dân dụng; công nghiệp (đường dây điện và trạm biến áp). |
II |
27/04/2030 |
This construction organization is also a contractor. The results of data analysis for contractors HOANG MAI GROUP JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 164 bidding packages, of which 108 were won, 40 were lost, 7 are pending results, and 9 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 49.12% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.35% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Ninh Bình (14), Hưng Yên (14), Phú Thọ (14), Sơn La (13), Thái Nguyên (13), Thanh Hoá (10), Quảng Ninh (9), Hà Nội (6), Hà Tĩnh (6), Lào Cai (5), Bắc Ninh (5), Tuyên Quang (4), Điện Biên (4), Lạng Sơn (4), Vĩnh Long (4), Cao Bằng (3), Lai Châu (2), Hải Phòng (2), Đồng Nai (2), Nghệ An (2), Đà Nẵng (1), Khánh Hòa (1), Quảng Ngãi (1), Tây Ninh (1), Undefined (24)
- Provinces before the merger where the contractor has participated in bidding: Sơn La (13), Thanh Hoá (10), Quảng Ninh (9), Thái Bình (9), Thái Nguyên (9), Phú Thọ (8), Nam Định (7), Hà Nam (7), Hà Nội (6), Hà Tĩnh (6), Hòa Bình (6), Hưng Yên (5), Bắc Cạn (4), Hà Giang (4), Điện Biên (4), Lạng Sơn (4), Trà Vinh (4), Yên Bái (3), Cao Bằng (3), Bắc Ninh (3), Lai Châu (2), Lào Cai (2), Hải Phòng (2), Đồng Nai (2), Nghệ An (2), Bắc Giang (2), Đà Nẵng (1), Khánh Hòa (1), Quảng Ngãi (1), Long An (1), Undefined (24)
- Has relationships with 59 Bid Solicitors
- Has competed against 147 contractors in 134 bidding packages, won 79 packages, lost 40 packages, 7 are pending results, and 8 were canceled.
- Has collaborated with 28 contractors in 43 bidding packages, won 32 packages, lost 10 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.