Công ty Cổ phần Đầu tư xây dựng và Cơ khí Nhật Thái

Found: 15:01 22/06/2021
Certificate of Capacity in construction
00012718
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address
Số 2301/87, Tổ 7, Ấp 2, xã Phước Bình, huyện Long Thành, tỉnh Đồng Nai
Moderator
Representative
Bùi Quang Thái  
Position
Chủ tịch HĐQT kiêm Giám đốc
Tax code/ Establish decision no.
3600811157
Certification date
05/06/2006
Granting agencies
Sở Kế hoạch và Đầu tư tỉnh Đồng Nai

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
DON-00012718
Thi công xây dựng công trình
Dân dụng
III
13/06/2023
3
BRV-00012718
Giám sát thi công xây dựng công trình
Dân dụng
III
24/06/2025
4
BRV-00012718
Giám sát thi công xây dựng công trình
Công nghiệp
III
24/06/2025
5
BRV-00012718
Giám sát thi công xây dựng công trình
Giao thông
Cầu, đường bộ
III
24/06/2025
6
BRV-00012718
Lập quy hoạch xây dựng

III
24/06/2025
7
BRV-00012718
Thiết kế, thẩm tra thiết kế xây dựng công trình
Dân dụng
III
24/06/2025
8
BRV-00012718
Thiết kế, thẩm tra thiết kế xây dựng công trình
Công nghiệp
III
24/06/2025
9
BRV-00012718
Thi công xây dựng công trình
Công nghiệp
Nhẹ
II
24/06/2025
10
BRV-00012718
Thi công xây dựng công trình
Giao thông
Đường thủy nội địa
III
24/06/2025
11
BRV-00012718
Thi công xây dựng công trình
Công nghiệp
Nhẹ
II
31/08/2025
12
BRV-00012718
Thi công xây dựng công trình
Giao thông
Đường thủy nội địa
III
31/08/2025
13
BRV-00012718
Thiết kế, thẩm tra thiết kế xây dựng công trình
Công nghiệp
III
31/08/2025
14
BRV-00012718
Thiết kế, thẩm tra thiết kế xây dựng công trình
Dân dụng
III
31/08/2025
15
BRV-00012718
Giám sát thi công xây dựng công trình
Dân dụng
III
31/08/2025
16
BRV-00012718
Giám sát thi công xây dựng công trình
Công nghiệp
III
31/08/2025
17
BRV-00012718
Giám sát thi công xây dựng công trình
Giao thông
Cầu, đường bộ
III
31/08/2025
18
BRV-00012718
Quản lý dự án đầu tư xây dựng

III
31/08/2025
19
BRV-00012718
Thi công xây dựng công trình
Hạ tầng kỹ thuật
Trừ công trình xử lý chất thải rắn
III
10/11/2025

This construction organization is also a contractor. The results of data analysis for contractors NHAT THAI INVESTMENT CONSTRUCYION AND MECHANICAL JOINT STOCK COMPANY are as follows:

  • Participated in 4 bidding packages, of which 4 were won, 0 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 96.75% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 97.71% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Đồng Nai (4)
  • Provinces before the merger where the contractor has participated in bidding: Đồng Nai (4)
  • Has relationships with 1 Bid Solicitors
  • Has competed against 3 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second