No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 |
HGI-00032009 |
Thi công xây dựng công trình |
Hạ tầng kỹ thuật (Công viên, cây xanh; Chiếu sáng công cộng; Tuyến ống cấp nước; Tuyến cống thoát nước mưa, cống chung; Tuyến cống thoát nước thải) |
III |
07/10/2029 |
This construction organization is also a contractor. The results of data analysis for contractors HAU GIANG WATER SUPPLY AND SEWERAGE - PROJECTS URBAN JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 40 bidding packages, of which 33 were won, 5 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 76.74% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.26% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hậu Giang (35), Cần Thơ (2), Undefined (3)
- Has relationships with 17 Bid Solicitors
- Has competed against 17 contractors in 9 bidding packages, won 3 packages, lost 5 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 0 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
blockquote>
- Published contractor selection plan of 21 project with total 125 bidding packages.
- Invitation for bids 17 package (with 18 bidding notice), conduct prequalification 0 package.
- Results announced of 23 packages, cancel bids 0 packages (among the packages above).
- Yes 23 packages with results without Tender/Prequalified notification .