Form No. 6A

Form No. 6A is used to prepare the E-HSMT using open bidding and limited bidding in a one-stage, two-envelope method.

Subject Ministry of Planning and Investment Code 6A
Category Circulars Signer Nguyễn Chí Dũng
Publtime 15/02/2024

mau-so-6a_e-hsmt-tu-van-2-tui.doc:

Documents of the Same Type "Circulars"

Code
Publtime
Summary
Code:3C 
Publtime:17/11/2024
Form No. 3C is used to create E-HSMST
Form No. 3C is used to create E-HSMST.
Code:3B
Publtime:17/11/2024
Form No. 3B is used to set up E-HSMT to apply wide bidding form, limited bidding by a method of two phase of two bags of records
Form No. 3B is used to set up E-HSMT to apply wide bidding form, limited bidding by a method of two phase of two bags of records
Code:3A 
Publtime:17/11/2024
Form No. 3A is used to set up E-HSMT to apply wide bidding, limited bidding, competitive offer in the method of one phase of a dossier bag;
Form No. 3A is used to set up E-HSMT to apply wide bidding, limited bidding, competitive offer in the method of one phase of a dossier bag;
Code:02C
Publtime:17/11/2024
Form No. 02C_ Determine approval, contractor selection plan
Form No. 02C is used to make approval decisions, contractor selection plans.
Code:02B
Publtime:17/11/2024
Form No. 02B_Production to appraise the contractor selection plan
Form No. 02B is used to prepare a contractor's selection plan for appraisal

Documents of the Same Issuing Authority "Ministry of Planning and Investment"

Code
Publtime
Summary
Code:3C 
Publtime:17/11/2024
Form No. 3C is used to create E-HSMST
Form No. 3C is used to create E-HSMST.
Code:3B
Publtime:17/11/2024
Form No. 3B is used to set up E-HSMT to apply wide bidding form, limited bidding by a method of two phase of two bags of records
Form No. 3B is used to set up E-HSMT to apply wide bidding form, limited bidding by a method of two phase of two bags of records
Code:3A 
Publtime:17/11/2024
Form No. 3A is used to set up E-HSMT to apply wide bidding, limited bidding, competitive offer in the method of one phase of a dossier bag;
Form No. 3A is used to set up E-HSMT to apply wide bidding, limited bidding, competitive offer in the method of one phase of a dossier bag;
Code:02C
Publtime:17/11/2024
Form No. 02C_ Determine approval, contractor selection plan
Form No. 02C is used to make approval decisions, contractor selection plans.
Code:02B
Publtime:17/11/2024
Form No. 02B_Production to appraise the contractor selection plan
Form No. 02B is used to prepare a contractor's selection plan for appraisal
You did not use the site, Click here to remain logged. Timeout: 60 second