Circular 05/2021/TT-BQP Regulating a number of contents on contractor selection within the management scope of the Ministry of National Defense

Replaces: Circular 88/2017/TT-BQP Regulating a number of contents on bidding and selecting contractors in the Ministry of National Defense.

Subject Ministry of Defense Code 05/2021/TT-BQP
Category Circulars Signer Phạm Vũ Luận
Area Đấu thầu Publtime 12/01/2021
Startvalid 01/03/2021

tt-05.2021.tt-bqp.pdf:

Documents of the Same Type "Circulars"

Code
Publtime
Summary
Publtime:06/03/2024
The bidding application form in the financial proposal
The bidding application form in the financial proposal
Publtime:06/03/2024
The bidding application form in the technical proposal
The bidding application form in the technical proposal
Publtime:17/11/2024
Appendix 10: Some contents of E-HSMT lead to limiting the participation of contractors as prescribed in Clause 3, Article 44 of the Bidding Law.
Appendix 10: Some contents of E-HSMT lead to limiting the participation of contractors as prescribed in Clause 3, Article 44 of the Bidding Law.
Publtime:17/11/2024
Appendix 9: Notice of information handling of bidding law violations
Appendix 9: Notice of information handling of bidding law violations
Publtime:17/11/2024
Appendix 8: Notice of information on foreign contractors winning bids in Vietnam
Appendix 8: Notice of information on foreign contractors winning bids in Vietnam

Documents of the Same Field "Đấu thầu"

Code
Publtime
Summary
Publtime:26/04/2024
Circular 06/2024/TT-BKHDT
Instructions for submitting and posting bidder selection and bidding document templates on the National Bidding System
Code:2C
Publtime:15/02/2024
Form 02C
Form No. 02C is used to prepare the Decision approving the bidder selection plan.
Code:2B
Publtime:15/02/2024
Form 02B
Form No. 02B is used to prepare a report on appraisal of contractor selection plan.
Code:2A
Publtime:15/02/2024
Form 02A
Form No. 02A is used to prepare the Bidder Selection Plan Proposal.
Code:1C
Publtime:15/02/2024
Form 01C
Form No. 01C is used to prepare the Decision approving the master plan for contractor selection.