Laboratory LAS-XD 90

Management Unit Info: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1

Address
Address before merge: Km 9 + 200, Đường Nguyễn Trãi, Phường Thanh Xuân Nam, Quận Thanh Xuân, TP. Hà Nội,
Address after merge (simplified): Km 9 + 200, Đường Nguyễn Trãi, Phường Thanh Xuân Nam, Quận Thanh Xuân, TP. Hà Nội,
Tax code
0100100953

Laboratory information

Lab Name
Experiment Center
Laboratory address before merge
Km 9 + 200, Đường Nguyễn Trãi, Phường Thanh Xuân Nam, Quận Thanh Xuân, TP. Hà Nội,, Hà Nội
Laboratory address after merge 
Km 9 + 200, Đường Nguyễn Trãi, Phường Thanh Xuân Nam, Quận Thanh Xuân, TP. Hà Nội,, Hà Nội
Lab code
LAS-XD 90
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 90 laboratory includes: Cement testing; Testing mineral additives for concrete; Testing of concrete and heavy concrete mixtures; Aggregate testing for concrete and mortar; Check metal materials and welds; Laboratory soil testing; Water analysis testing for construction. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 05 years from the date of issue and replaces Decision No. 147/QD-BXD dated April 13, 201 l of the Minister of Construction.
Last update
07/03/2022 - 3 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 807/GCN-BXD. 

This lab belongs to the contractor. The results of data analysis for contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 are as follows:

The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 are as follows:
  • Announced Contractor selection plan of 55 project with total 70 bidding packages.
  • Inviting bids 14 has been carried out package (with 14 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 43 package, cancel the bid for 0 package (among the packages above).
  • Yes 34 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second