Laboratory LAS-XD 52

Management Unit Info: HAI PHONG IRRIGATION CONSULTANT JOINT STOCK COMPANY

Address
Address before merge: Số 816 Đường Trần Nhân Tông, Phường Nam Sơn, Quận Kiến An, Thành phố Hải Phòng;
Address after merge (simplified): Số 816 Đường Trần Nhân Tông, Phường Nam Sơn, Quận Kiến An, Thành phố Hải Phòng;
Tax code
0200114357

Laboratory information

Lab Name
Geotechnical Laboratory - Construction Materials;
Laboratory address
Address before merge: Số 816 Đường Trần Nhân Tông, Phường Nam Sơn, Quận Kiến An, Thành phố Hải Phòng;
Address after merge (simplified): Số 816 Đường Trần Nhân Tông, Phường Nam Sơn, Quận Kiến An, Thành phố Hải Phòng;
Lab code
LAS-XD 52
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 52 laboratory includes: Concrete mixture and heavy concrete; Testing aggregates for concrete and mortar; Laboratory soil mechanical testing; Field testing. Technical standards of the test are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 05 years from the date of issue and replaces Decision No. 123/QD-BXD dated January 22, 2012 by the Minister of Construction.
Last update
07/03/2022 - 4 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 766/GCN-BXD. 
2 Certificate 175/GCN-BXD

This lab belongs to the contractor. The results of data analysis for contractor HAI PHONG IRRIGATION CONSULTANT JOINT STOCK COMPANY are as follows:

  • Participated in 75 bidding packages, of which 66 were won, 8 were lost, 1 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 79.63% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 99.5% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Hải Phòng (31), Hưng Yên (3), Ninh Bình (2), Hà Tĩnh (1), Undefined (38)
  • Provinces before the merger where the contractor has participated in bidding: Hải Phòng (15), Hải Dương (3), Hưng Yên (2), Nam Định (2), Thái Bình (1), Hà Tĩnh (1), Undefined (51)
  • Has relationships with 23 Bid Solicitors
  • Has competed against 23 contractors in 17 bidding packages, won 9 packages, lost 8 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 16 contractors in 19 bidding packages, won 13 packages, lost 6 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party HAI PHONG IRRIGATION CONSULTANT JOINT STOCK COMPANY are as follows:
  • Announced Contractor selection plan of 0 project with total 0 bidding packages.
  • Inviting bids 0 has been carried out package (with 0 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 0 package, cancel the bid for 0 package (among the packages above).
  • Yes 0 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second