Laboratory LAS-XD 418

Management Unit Info: Trung tâm Giám định chất lượng xây dựng tỉnh Lào Cai

Address
Address before merge: Km3 Đại lộ Trần Hưng Đạo, P. Nam Cường, TP. Lào Cai, Tỉnh Lào Cai.
Address after merge (simplified): Km3 Đại lộ Trần Hưng Đạo, P. Nam Cường, TP. Lào Cai, Tỉnh Lào Cai.
Tax code
5300225726

Laboratory information

Lab Name
Construction specialized laboratory.
Laboratory address
Address before merge: Km3 Đại lộ Trần Hưng Đạo, P. Nam Cường, TP. Lào Cai, Tỉnh Lào Cai.
Address after merge (simplified): Km3 Đại lộ Trần Hưng Đạo, P. Nam Cường, TP. Lào Cai, Tỉnh Lào Cai.
Lab code
LAS-XD 418
Recognition date
Recognition content
The list of testing criteria eligible for operation in this Certificate includes: Cement testing; Physical and mechanical testing of aggregates for concrete and construction mortar; Physical and mechanical testing of concrete and concrete mixtures; Mechanical testing of construction mortar; Mechanical testing of concrete bricks; Mechanical testing of self-inserting concrete bricks; Mechanical testing of baked clay bricks; Physical and mechanical testing of mineral powder in asphalt concrete; Mechanical testing of bentonite solution; Mechanical testing of asphalt concrete; Asphalt mechanical testing; Metal inspection testing, welding; Laboratory soil mechanical testing; Field testing; Chemical analysis of water for construction. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 05 years from the date of issue, replacing Decision No. 171/QD-BXD dated May 10, 2012 and Decision No. 22/QD-BXD dated January 20, 2014
Last update
09/03/2022 - 2 update.
You need to Login or Sign up to view all informations.

List of certificates

This lab belongs to the contractor. The results of data analysis for contractor Trung tâm Giám định chất lượng xây dựng tỉnh Lào Cai are as follows:

  • Participated in 1573 bidding packages, of which 1568 were won, 2 were lost, 3 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 8.79% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 98.19% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Lào Cai (912), Hà Nội (1), Thái Nguyên (1), Đồng Nai (1), Undefined (658)
  • Provinces before the merger where the contractor has participated in bidding: Lào Cai (39), Hà Nội (1), Thái Nguyên (1), Đồng Nai (1), Undefined (1531)
  • Has relationships with 120 Bid Solicitors
  • Has competed against 14 contractors in 13 bidding packages, won 9 packages, lost 2 packages, 2 are pending results, and 0 were canceled.
  • Has collaborated with 11 contractors in 16 bidding packages, won 15 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party Lao Cai construction verfication center are as follows:
  • Announced Contractor selection plan of 7 project with total 12 bidding packages.
  • Inviting bids 7 has been carried out package (with 8 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 5 package, cancel the bid for 0 package (among the packages above).
  • Yes 0 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second