Laboratory LAS-XD 37

Management Unit Info: Ha Noi Institute of building science technology and economic

Address
Address before merge: Số 38 Cát Linh, Phường Cát Linh, Quận Đống Đa, TP. Hà Nội
Address after merge (simplified): Số 38 Cát Linh, Phường Cát Linh, Quận Đống Đa, TP. Hà Nội
Tax code
0100731483

Laboratory information

Lab Name
Soil Mechanics Laboratory
Laboratory address
Address before merge: Số 38 Cát Linh, Phường Cát Linh, Quận Đống Đa, TP. Hà Nội (Điện thoại: 04.37335801/37335590; Fax: 04.37335801; Email: [email protected])
Address after merge (simplified): Số 38 Cát Linh, Phường Cát Linh, Quận Đống Đa, TP. Hà Nội (Điện thoại: 04.37335801/37335590; Fax: 04.37335801; Email: [email protected])
Lab code
LAS-XD 37
Recognition date
Recognition content
The list of testing criteria eligible for operation in this Certificate includes: Soil testing in the laboratory; Field testing; Physical and mechanical testing of bentonite solution. Technical standards used for the tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 5 years from the date of issue, replacing Decision No. 06/QD-BXD dated January 5, 2009.
Last update
07/03/2022 - 2 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 265/GCN-BXD. 
2 Certificate 181/GCN-BXD

This lab belongs to the contractor. The results of data analysis for contractor Ha Noi Institute of building science technology and economic are as follows:

  • Participated in 115 bidding packages, of which 112 were won, 3 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 84.64% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 97.02% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Hà Nội (66), Thừa Thiên - Huế (1), Undefined (48)
  • Provinces before the merger where the contractor has participated in bidding: Hà Nội (26), Undefined (89)
  • Has relationships with 49 Bid Solicitors
  • Has competed against 22 contractors in 17 bidding packages, won 14 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 13 contractors in 15 bidding packages, won 13 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party Ha Noi Institute of building science technology and economic are as follows:
  • Announced Contractor selection plan of 25 project with total 64 bidding packages.
  • Inviting bids 13 has been carried out package (with 15 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 26 package, cancel the bid for 0 package (among the packages above).
  • Yes 13 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second