No. | Decision name | Certification period |
---|---|---|
1 | Certificate 204/GCN-BXD | |
2 | Certificate 865/GCN-BXD. |
This lab belongs to the contractor. The results of data analysis for contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 4 are as follows:
You need to Login or Sign up to view all informations.
- Participated in 744 bidding packages, of which 556 were won, 158 were lost, 17 are pending results, and 13 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 32% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 75.04% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Hà Nội (85), Đà Nẵng (67), Lâm Đồng (61), Gia Lai (42), TP.Hồ Chí Minh (38), Khánh Hòa (25), Đắk Lắk (25), Quảng Ninh (24), Thanh Hoá (24), Hải Phòng (24), Đồng Nai (14), Lai Châu (13), Quảng Ngãi (13), Nghệ An (13), Cần Thơ (10), Phú Thọ (9), Ninh Bình (8), Hưng Yên (7), Lào Cai (7), Quảng Trị (6), Hà Tĩnh (6), Bắc Ninh (4), Tuyên Quang (4), Thừa Thiên - Huế (3), Vĩnh Long (3), Sơn La (3), Đồng Tháp (2), Tây Ninh (2), Nationwide (2), Thái Nguyên (2), Lạng Sơn (2), Cà Mau (1), (1), Undefined (248)
- Provinces before the merger where the contractor has participated in bidding: Hà Nội (84), Đà Nẵng (40), Gia Lai (38), Bình Thuận (32), TP.Hồ Chí Minh (29), Thanh Hoá (24), Lâm Đồng (23), Quảng Ninh (23), Quảng Nam (22), Khánh Hòa (16), Hải Dương (13), Đắk Lắk (13), Nghệ An (13), Lai Châu (12), Kon Tum (11), Phú Yên (10), Hải Phòng (9), Đắk Nông (7), Ninh Thuận (7), Bình Định (7), Nam Định (7), Đồng Nai (6), Hà Tĩnh (6), Lào Cai (6), Bà Rịa - Vũng Tàu (5), Bình Phước (5), Quảng Trị (5), Ninh Bình (5), Thái Bình (5), Hậu Giang (4), Cần Thơ (4), Hưng Yên (4), Hòa Bình (4), Phú Thọ (4), Yên Bái (4), Thừa Thiên - Huế (3), Trà Vinh (3), Hà Giang (3), Sơn La (3), Vĩnh Phúc (3), Quảng Ngãi (2), Tiền Giang (2), Bắc Giang (2), Long An (2), Nationwide (2), Thái Nguyên (2), Lạng Sơn (2), Quảng Bình (1), Tây Ninh (1), Bạc Liêu (1), Bắc Ninh (1), Sóc Trăng (1), (1), Bình Dương (1), Undefined (282)
- Has relationships with 158 Bid Solicitors
- Has competed against 163 contractors in 280 bidding packages, won 107 packages, lost 158 packages, 8 are pending results, and 7 were canceled.
- Has collaborated with 27 contractors in 42 bidding packages, won 35 packages, lost 5 packages, 2 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
blockquote>
- Announced Contractor selection plan of 4 project with total 13 bidding packages.
- Inviting bids 11 has been carried out package (with 13 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 7 package, cancel the bid for 0 package (among the packages above).
- Yes 0 package with results without TBMT, TBMST.