Laboratory LAS-XD 249

Management Unit Info: BINH DUONG GENERAL CONSTRUCTION AND CONSULTATION JOINT STOCK

Address
Address before merge: Số 7, Đường Cách Mạng Tháng 8, Phường Chánh Nghĩa, Thành phố Thủ Dầu Một, Tỉnh Bình Dương.
Address after merge (simplified): Số 7, Đường Cách Mạng Tháng 8, Phường Chánh Nghĩa, Thành phố Thủ Dầu Một, Tỉnh Bình Dương.
Tax code
3700514006

Laboratory information

Lab Name
Center for Testing Construction Materials and Construction Quality.
Laboratory address before merge
Số 7, Đường Cách Mạng Tháng 8, Phường Chánh Nghĩa, Thành phố Thủ Dầu Một, Tỉnh Bình Dương., Bình Dương
Laboratory address after merge 
Số 7, Đường Cách Mạng Tháng 8, Phường Chánh Nghĩa, Thành phố Thủ Dầu Một, Tỉnh Bình Dương., TP.Hồ Chí Minh
Lab code
LAS-XD 249
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 249 laboratory includes: Physical and mechanical testing of cement; Testing of concrete and heavy concrete mixtures; Aggregate testing for concrete and mortar; Laboratory soil mechanical testing; Testing of metal materials and welded joints; Asphalt concrete testing; Testing bitumen and liquid asphalt; Field soil testing; Physical and mechanical testing of mineral powder materials in asphalt concrete; Testing masonry; Mechanical testing of self-inserting concrete bricks; Mechanical testing of concrete bricks; Testing of terazo tiles; Testing construction mortar; Testing reinforced materials with adhesives. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 05 years from the date of issue and replaces Decision No. 40/QD-BXD dated January 25, 2010 of the Minister of Construction.
Last update
07/03/2022 - 2 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 466/GCN-BXD. 

This lab belongs to the contractor. The results of data analysis for contractor BINH DUONG GENERAL CONSTRUCTION AND CONSULTATION JOINT STOCK are as follows:

  • Participated in 8 bidding packages, of which 8 were won, 0 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 96.5% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 97.03% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Undefined (8)
  • Provinces before the merger where the contractor has participated in bidding: Undefined (8)
  • Has relationships with 3 Bid Solicitors
  • Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 9 bidding packages with 7 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party BINH DUONG GENERAL CONSTRUCTION AND CONSULTATION JOINT STOCK are as follows:
  • Announced Contractor selection plan of 58 project with total 224 bidding packages.
  • Inviting bids 123 has been carried out package (with 125 invitation to bid notice), pre-qualification of 3 package is carried out.
  • Results announced of 76 package, cancel the bid for 2 package (among the packages above).
  • Yes 1 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second