No. | Decision name | Certification period |
---|---|---|
1 | Certificate 89/GCN-SXD Hà Nội |
This lab belongs to the contractor. The results of data analysis for contractor CONSULTANCY COMPANY LIMITED OF UNIVERSITY OF CIVIL ENGINEERING are as follows:
You need to Login or Sign up to view all informations.
- Participated in 667 bidding packages, of which 586 were won, 62 were lost, 14 are pending results, and 5 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 3.05% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 88.27% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Hà Nội (120), Ninh Bình (52), Hải Phòng (32), Phú Thọ (17), Tuyên Quang (15), Bắc Ninh (14), Đà Nẵng (12), Quảng Ninh (12), Đắk Lắk (11), TP.Hồ Chí Minh (10), Thanh Hoá (9), Nghệ An (9), Cà Mau (8), Đồng Nai (8), Hưng Yên (8), Lào Cai (6), Cần Thơ (5), Khánh Hòa (5), Vĩnh Long (4), Thái Nguyên (4), Sơn La (4), Thừa Thiên - Huế (4), Đồng Tháp (3), Lạng Sơn (3), Quảng Ngãi (3), Quảng Trị (3), An Giang (3), Lâm Đồng (2), Tây Ninh (2), Hà Tĩnh (2), Gia Lai (2), Nationwide (2), Lai Châu (1), Undefined (289)
- Provinces before the merger where the contractor has participated in bidding: Hà Nội (120), Hà Nam (41), Hải Phòng (21), Tuyên Quang (14), Quảng Ninh (12), Đà Nẵng (11), Hải Dương (11), Bắc Ninh (10), Đắk Lắk (9), Thanh Hoá (9), Nghệ An (9), Ninh Bình (7), TP.Hồ Chí Minh (7), Phú Thọ (7), Yên Bái (6), Hưng Yên (6), Vĩnh Phúc (6), Nam Định (5), Bắc Giang (4), Bạc Liêu (4), Hòa Bình (4), Bình Phước (4), Cà Mau (4), Sơn La (4), Thừa Thiên - Huế (4), Đồng Nai (4), Tiền Giang (3), Lạng Sơn (3), Quảng Ngãi (3), Thái Nguyên (3), Hậu Giang (3), Kiên Giang (3), Khánh Hòa (3), Bà Rịa - Vũng Tàu (2), Vĩnh Long (2), Phú Yên (2), Thái Bình (2), Đắk Nông (2), Long An (2), Hà Tĩnh (2), Bình Định (2), Trà Vinh (2), Ninh Thuận (2), Nationwide (2), Quảng Trị (2), Quảng Bình (1), Bắc Kạn (1), Hà Giang (1), Đồng Tháp (1), Sóc Trăng (1), Cần Thơ (1), Lào Cai (1), Lai Châu (1), Bình Dương (1), Quảng Nam (1), Undefined (289)
- Has relationships with 339 Bid Solicitors
- Has competed against 225 contractors in 179 bidding packages, won 106 packages, lost 61 packages, 8 are pending results, and 4 were canceled.
- Has collaborated with 118 contractors in 176 bidding packages, won 147 packages, lost 25 packages, 1 are pending results, and 3 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 482 bidding packages with 71 roles.
blockquote>
- Announced Contractor selection plan of 10 project with total 31 bidding packages.
- Inviting bids 12 has been carried out package (with 12 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 12 package, cancel the bid for 0 package (among the packages above).
- Yes 1 package with results without TBMT, TBMST.