No. | Decision name | Certification period |
---|---|---|
1 | Certificate 131/GCN-BXD |
This lab belongs to the contractor. The results of data analysis for contractor National Research Institute of Mechanical Engineering are as follows:
You need to Login or Sign up to view all informations.
- Participated in 951 bidding packages, of which 481 were won, 368 were lost, 59 are pending results, and 43 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 7.13% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 92.16% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Hải Phòng (166), Quảng Ninh (120), Phú Thọ (62), Lâm Đồng (43), TP.Hồ Chí Minh (31), Hà Nội (30), Vĩnh Long (29), Hưng Yên (26), Thanh Hoá (23), Sơn La (23), Gia Lai (21), Ninh Bình (19), Đồng Nai (16), Quảng Ngãi (13), Bắc Ninh (12), Đắk Lắk (12), Hà Tĩnh (11), Lai Châu (11), Cần Thơ (10), Đà Nẵng (9), Lào Cai (8), Lạng Sơn (7), Thái Nguyên (6), Nghệ An (5), An Giang (2), Cà Mau (2), Quảng Trị (2), Tây Ninh (2), Thừa Thiên - Huế (2), Tuyên Quang (2), Nationwide (2), Đồng Tháp (1), Khánh Hòa (1), Undefined (230)
- Provinces before the merger where the contractor has participated in bidding: Quảng Ninh (120), Hải Phòng (85), Hải Dương (81), Hòa Bình (41), Hà Nội (29), Trà Vinh (29), Bình Thuận (26), Thái Bình (26), Bà Rịa - Vũng Tàu (23), Thanh Hoá (23), Sơn La (22), Phú Thọ (21), Ninh Bình (19), Gia Lai (17), Kon Tum (12), Đắk Nông (11), Hà Tĩnh (11), Lai Châu (11), Bắc Giang (9), Bình Phước (8), Đồng Nai (8), Đắk Lắk (8), TP.Hồ Chí Minh (8), Hậu Giang (8), Lạng Sơn (7), Lâm Đồng (6), Thái Nguyên (6), Quảng Nam (6), Nghệ An (5), Yên Bái (5), Phú Yên (4), Bình Định (3), Đà Nẵng (3), Bắc Ninh (3), Lào Cai (3), Kiên Giang (2), Cà Mau (2), Thừa Thiên - Huế (2), Tuyên Quang (2), Nationwide (2), Cần Thơ (1), Tiền Giang (1), Sóc Trăng (1), Quảng Bình (1), Tây Ninh (1), Long An (1), Ninh Thuận (1), Undefined (236)
- Has relationships with 161 Bid Solicitors
- Has competed against 674 contractors in 670 bidding packages, won 218 packages, lost 366 packages, 53 are pending results, and 33 were canceled.
- Has collaborated with 61 contractors in 80 bidding packages, won 44 packages, lost 27 packages, 6 are pending results, and 3 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
blockquote>
- Announced Contractor selection plan of 19 project with total 35 bidding packages.
- Inviting bids 105 has been carried out package (with 105 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 14 package, cancel the bid for 0 package (among the packages above).
- Yes 5 package with results without TBMT, TBMST.