Laboratory LAS-XD 1852

Management Unit Info: CENTRAL POWER ENGINEERING CONSULTING COMPANY - BRANCH OF CENTRAL POWER CORPORATION

Address
Address before merge: số 30 Lê Thánh Tôn, Phường Hải Châu 1, Quận Hải Châu, Thành Phố Đà Nẵng
Address after merge (simplified): số 30 Lê Thánh Tôn, Phường Hải Châu 1, Quận Hải Châu, Thành Phố Đà Nẵng
Tax code
0400101394-031

Laboratory information

Lab Name
Geological Survey Department - Geotechnical Testing
Laboratory address before merge
số 30 Lê Thánh Tôn, Phường Hải Châu 1, Quận Hải Châu, Thành Phố Đà Nẵng, Đà Nẵng
Laboratory address after merge 
số 30 Lê Thánh Tôn, Phường Hải Châu 1, Quận Hải Châu, Thành Phố Đà Nẵng, Đà Nẵng
Lab code
LAS-XD 1852
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 737 laboratory includes: Physical and mechanical testing of soil and rock in the laboratory; Field experiments; Bentonite material testing; Water chemical analysis test for construction. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of a technical standard replacing the old standard, the corresponding new standard must be applied. This certificate is valid for 05 years from the date of issue and replaces Certificate No. 1111/GCN-BXD dated August 2, 2019.
Last update
28/02/2022 - 3 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 142/GCN-BXD
2 Certificate 1111/GCN-BXD. 

This lab belongs to the contractor. The results of data analysis for contractor CENTRAL POWER ENGINEERING CONSULTING COMPANY - BRANCH OF CENTRAL POWER CORPORATION are as follows:

  • Participated in 104 bidding packages, of which 104 were won, 0 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 6.97% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 92.69% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Đắk Lắk (30), Quảng Ngãi (22), Gia Lai (18), Đà Nẵng (9), Lâm Đồng (6), Quảng Trị (3), Thừa Thiên - Huế (3), Đồng Nai (1), (1), Undefined (11)
  • Provinces before the merger where the contractor has participated in bidding: Undefined (104)
  • Has relationships with 13 Bid Solicitors
  • Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 98 bidding packages with 15 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party CENTRAL POWER ENGINEERING CONSULTING COMPANY - BRANCH OF CENTRAL POWER CORPORATION are as follows:
  • Announced Contractor selection plan of 4 project with total 4 bidding packages.
  • Inviting bids 3 has been carried out package (with 3 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 4 package, cancel the bid for 0 package (among the packages above).
  • Yes 1 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second