Laboratory LAS-XD 1421

Management Unit Info: CÔNG TY TNHH TƯ VẤN XÂY DỰNG KIỂM ĐỊNH MINH AN

Address
Address before merge: Số 294/1 Hùng Vương, Ph. Tân Lập, Tp. Buôn Ma Thuột, Tỉnh Đắk Lắk
Address after merge (simplified): Số 294/1 Hùng Vương, Ph. Tân Lập, Tp. Buôn Ma Thuột, Tỉnh Đắk Lắk
Tax code
6001395640

Laboratory information

Lab Name
Materials laboratory and construction inspection.
Laboratory address
Address before merge: Số 294/1 Hùng Vương, Ph. Tân Lập, Tp. Buôn Ma Thuột, Tỉnh Đắk Lắk
Address after merge (simplified): Số 294/1 Hùng Vương, Ph. Tân Lập, Tp. Buôn Ma Thuột, Tỉnh Đắk Lắk
Lab code
LAS-XD 1421
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of the LAS-Construction 1421 laboratory includes: Mechanical and physical testing of cement; Heavy concrete and concrete mixtures; Test concrete aggregates and mortar; Laboratory soil mechanical testing; Inspection of construction steel; Asphalt concrete; Bitumen; Field testing; Testing construction mortar; Physical and mechanical testing of mineral powder materials in B. T.N; Mechanical testing of masonry bricks; Mechanical testing of self-inserting concrete bricks; Physical and mechanical testing of cement floor tiles; Mechanical testing of roofing tiles; Mechanical testing of concrete bricks; Autoclaved aerated concrete (AAC) brick testing; Testing foam concrete bricks, non-autoclaved gas; Testing of stone tiles - Granite tiles. Technical standards used for the tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 05 years from the date of issue and replaces Decision No. 428/QD-BXD dated September 9, 2014 of the Minister of Construction.
Last update
07/03/2022 - 4 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 345/GCN-BXD. 

This lab belongs to the contractor. The results of data analysis for contractor CÔNG TY TNHH TƯ VẤN XÂY DỰNG KIỂM ĐỊNH MINH AN are as follows:

  • Participated in 60 bidding packages, of which 55 were won, 3 were lost, 1 are pending results, and 1 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 85.92% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 97.29% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Đắk Lắk (26), Undefined (34)
  • Provinces before the merger where the contractor has participated in bidding: Undefined (60)
  • Has relationships with 17 Bid Solicitors
  • Has competed against 17 contractors in 15 bidding packages, won 11 packages, lost 3 packages, 0 are pending results, and 1 were canceled.
  • Has collaborated with 14 contractors in 17 bidding packages, won 14 packages, lost 2 packages, 0 are pending results, and 1 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second