Laboratory LAS-XD 1376

Management Unit Info: Quality Assurance and testing Center Of Ba Ria Vung Tau

Address
Address before merge: 379 đường Hà Huy Tập, Phường Phước Trung, Thành phố Bà Rịa, Tỉnh Bà Rịa -Vũng Tàu.
Address after merge (simplified): 379 đường Hà Huy Tập, Phường Phước Trung, Thành phố Bà Rịa, Tỉnh Bà Rịa -Vũng Tàu.
Tax code
3502016760

Laboratory information

Lab Name
Testing - Calibration Department.
Laboratory address
Address before merge: 379 đường Hà Huy Tập, Phường Phước Trung, Thành phố Bà Rịa, Tỉnh Bà Rịa -Vũng Tàu.
Address after merge (simplified): 379 đường Hà Huy Tập, Phường Phước Trung, Thành phố Bà Rịa, Tỉnh Bà Rịa -Vũng Tàu.
Lab code
LAS-XD 1376
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of the LAS-Construction 1376 laboratory includes: Steel mechanical testing - tensile testing; Concrete compression test; Testing measures grounding resistance, lightning protection and grounding of electrical equipment. Technical standards used for the tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 05 years from the date of issue and replaces Decision No. 452/QD-BXD dated December 23, 2013 of the Minister of Construction.
Last update
07/03/2022 - 3 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 569/GCN-BXD. 
2 Certificate 1031/GCN-BXD. 

This lab belongs to the contractor. The results of data analysis for contractor Quality Assurance and testing Center Of Ba Ria Vung Tau are as follows:

  • Participated in 10 bidding packages, of which 9 were won, 1 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 70.31% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 89.81% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: TP.Hồ Chí Minh (5), Gia Lai (3), Undefined (2)
  • Provinces before the merger where the contractor has participated in bidding: Gia Lai (3), Undefined (7)
  • Has relationships with 7 Bid Solicitors
  • Has competed against 1 contractors in 2 bidding packages, won 1 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party Quality Assurance and testing Center Of Ba Ria Vung Tau are as follows:
  • Announced Contractor selection plan of 22 project with total 26 bidding packages.
  • Inviting bids 6 has been carried out package (with 6 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 26 package, cancel the bid for 0 package (among the packages above).
  • Yes 20 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second