Laboratory LAS-XD 1324

Management Unit Info: Công ty TNHH Tư vấn Đầu tư xây dựng và Kiểm định 99

Address
Address before merge: Tổ dân phố Nghĩa Lập 4, Thị trấn Thạnh Mỹ, Huyện Đơn Dương, Tỉnh Lâm Đồng.
Address after merge (simplified): Tổ dân phố Nghĩa Lập 4, Thị trấn Thạnh Mỹ, Huyện Đơn Dương, Tỉnh Lâm Đồng.
Tax code
5801459161

Laboratory information

Lab Name
Materials Laboratory and Construction Quality Inspection.
Laboratory address before merge
Tổ dân phố Nghĩa Lập 2, Thị trấn Thạnh Mỹ, Huyện Đơn Dương, Tỉnh Lâm Đồng., Lâm Đồng
Laboratory address after merge 
Tổ dân phố Nghĩa Lập 2, Thị trấn Thạnh Mỹ, Huyện Đơn Dương, Tỉnh Lâm Đồng., Lâm Đồng
Lab code
LAS-XD 1324
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of the LAS-Construction 1324 laboratory includes: Mechanical and physical testing of cement; Testing concrete aggregates and mortar; Testing of concrete and heavy concrete mixtures; Testing construction mortar; Check steel, metal, welds; Mechanical testing of bricks; Laboratory soil mechanical testing; Field testing; Asphalt concrete; Bitumen resin, acid emulsion; Chemical analysis of water for construction. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of a technical standard replacing the old standard, the corresponding new standard must be applied. This Certificate is valid for 5 years from the date of issuance and replaces Certificate No. 1378/GCN-BXD dated January 21, 2009 of the Minister of Construction.
Last update
07/03/2022 - 6 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 89/GCN-BXD

This lab belongs to the contractor. The results of data analysis for contractor Công ty TNHH Tư vấn Đầu tư xây dựng và Kiểm định 99 are as follows:

  • Participated in 2 bidding packages, of which 2 were won, 0 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 99.7% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 99.86% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Lâm Đồng (2)
  • Provinces before the merger where the contractor has participated in bidding: Lâm Đồng (2)
  • Has relationships with 1 Bid Solicitors
  • Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 0 bidding packages with 0 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second