No. | Decision name | Certification period |
---|---|---|
1 | Certificate 80/GCN-BXD |
This lab belongs to the contractor. The results of data analysis for contractor DESIGN CONSULTANT AND INVESTMENT OF CONSTRUCTIONS ONE MEMBER LIMITED LIABILITY COMPANY - MINISTRY OF DEFENCE are as follows:
You need to Login or Sign up to view all informations.
- Participated in 1268 bidding packages, of which 1171 were won, 73 were lost, 17 are pending results, and 7 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 5.33% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 108.36% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding: Hà Nội (242), TP.Hồ Chí Minh (156), Đà Nẵng (53), Vĩnh Long (49), Đồng Nai (43), Tây Ninh (36), Lâm Đồng (29), Khánh Hòa (25), Gia Lai (25), An Giang (24), Phú Thọ (24), Cà Mau (22), Đồng Tháp (18), Bắc Ninh (17), Ninh Bình (15), Quảng Ngãi (15), Quảng Ninh (14), Hải Phòng (13), Lào Cai (12), Đắk Lắk (11), Hưng Yên (10), Cao Bằng (10), Thanh Hoá (9), Nghệ An (8), Quảng Trị (8), Tuyên Quang (7), Thái Nguyên (6), Sơn La (5), Thừa Thiên - Huế (5), Lạng Sơn (4), Cần Thơ (3), Lai Châu (2), Nationwide (1), Undefined (360)
- Provinces before the merger where the contractor has participated in bidding: Hà Nội (165), TP.Hồ Chí Minh (59), Đồng Nai (31), Bình Dương (24), Đà Nẵng (23), Tây Ninh (20), Trà Vinh (17), Kiên Giang (14), Khánh Hòa (14), Lâm Đồng (12), Bà Rịa - Vũng Tàu (11), Hòa Bình (11), Bắc Giang (11), Đồng Tháp (10), Quảng Ninh (10), Vĩnh Long (9), Bạc Liêu (9), Gia Lai (9), Quảng Nam (8), Cà Mau (8), Cao Bằng (8), Nghệ An (7), Thanh Hoá (7), Hà Giang (6), Ninh Bình (6), Lào Cai (6), Tiền Giang (6), Bình Phước (5), Ninh Thuận (5), Thái Bình (5), Vĩnh Phúc (5), Hải Phòng (5), Quảng Trị (5), Quảng Ngãi (5), Nam Định (4), Long An (4), Đắk Nông (4), Lạng Sơn (4), Thái Nguyên (4), Kon Tum (4), Sơn La (4), Bình Định (4), Bình Thuận (4), An Giang (3), Bến Tre (3), Đắk Lắk (3), Phú Thọ (2), Cần Thơ (2), Lai Châu (2), Hà Nam (1), Bắc Ninh (1), Quảng Bình (1), Hưng Yên (1), Sóc Trăng (1), Bắc Cạn (1), Thừa Thiên - Huế (1), Tuyên Quang (1), Nationwide (1), Yên Bái (1), Undefined (664)
- Has relationships with 464 Bid Solicitors
- Has competed against 300 contractors in 228 bidding packages, won 146 packages, lost 71 packages, 9 are pending results, and 2 were canceled.
- Has collaborated with 95 contractors in 124 bidding packages, won 104 packages, lost 12 packages, 5 are pending results, and 3 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
blockquote>
- Announced Contractor selection plan of 93 project with total 432 bidding packages.
- Inviting bids 160 has been carried out package (with 189 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 150 package, cancel the bid for 0 package (among the packages above).
- Yes 6 package with results without TBMT, TBMST.