Laboratory LAS-XD 11

Management Unit Info: Công ty Cổ phần Tư vấn đầu tư Xây dựng Bắc Giang

Address
Address before merge: 392 Xương Giang, Phường Ngô Quyền, Tp. Bắc Giang, Tỉnh Bắc Giang
Address after merge (simplified): 392 Xương Giang, Phường Ngô Quyền, Tp. Bắc Giang, Tỉnh Bắc Giang
Tax code
2400299645

Laboratory information

Lab Name
Laboratory of soil mechanics and construction materials
Laboratory address before merge
392 Xương Giang, Phường Ngô Quyền, Tp. Bắc Giang, Tỉnh Bắc Giang, Bắc Giang
Laboratory address after merge 
392 Xương Giang, Phường Ngô Quyền, Tp. Bắc Giang, Tỉnh Bắc Giang, Bắc Ninh
Lab code
LAS-XD 11
Recognition date
Recognition content
The list of testing criteria eligible for specialized construction activities of LAS-Construction 11 laboratory includes: Testing concrete aggregates and mortar; Heavy concrete and concrete mixtures; Testing construction mortar; Mechanical testing of masonry bricks; Laboratory soil testing; Field testing. Technical standards used for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of technical standards to replace the old standards, the corresponding new standards must be applied. This certificate is valid for 5 years from the date of issue and replaces Decision No. 160/QD-BXD dated June 4, 2013 and 266/QD-BXD dated May 15, 2015 of the Minister of Construction.
Last update
07/03/2022 - 4 update.
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 642/GCN-BXD. 

This lab belongs to the contractor. The results of data analysis for contractor Công ty Cổ phần Tư vấn đầu tư Xây dựng Bắc Giang are as follows:

  • Participated in 267 bidding packages, of which 228 were won, 29 were lost, 5 are pending results, and 5 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 70.09% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 98.18% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: Bắc Ninh (153), Hà Nội (3), TP.Hồ Chí Minh (1), Cao Bằng (1), Lạng Sơn (1), Undefined (108)
  • Provinces before the merger where the contractor has participated in bidding: Bắc Giang (98), Bắc Ninh (8), Hà Nội (3), Bình Dương (1), Cao Bằng (1), Undefined (156)
  • Has relationships with 84 Bid Solicitors
  • Has competed against 74 contractors in 67 bidding packages, won 30 packages, lost 29 packages, 5 are pending results, and 3 were canceled.
  • Has collaborated with 21 contractors in 35 bidding packages, won 30 packages, lost 3 packages, 2 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 237 bidding packages with 37 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party Công ty Cổ phần Tư vấn đầu tư Xây dựng Bắc Giang are as follows:
  • Announced Contractor selection plan of 9 project with total 21 bidding packages.
  • Inviting bids 13 has been carried out package (with 14 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 10 package, cancel the bid for 0 package (among the packages above).
  • Yes 0 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second