No. | Decision name | Certification period |
---|---|---|
1 | Certificate 563/GCN-BXD. | |
2 | Certificate 129/GCN-BXD |
This lab belongs to the contractor. The results of data analysis for contractor CIC NAM VIET CONSTRUCTION CONSULTING CORPORATION are as follows:
You need to Login or Sign up to view all informations.
- Participated in 277 bidding packages, of which 207 were won, 63 were lost, 3 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 14.43% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.13% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Kiên Giang (155), Cà Mau (3), Sóc Trăng (2), Vĩnh Long (2), Cần Thơ (1), Undefined (114)
- Has relationships with 62 Bid Solicitors
- Has competed against 144 contractors in 106 bidding packages, won 35 packages, lost 62 packages, 5 are pending results, and 4 were canceled.
- Has collaborated with 16 contractors in 17 bidding packages, won 6 packages, lost 10 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
blockquote>
- Announced Contractor selection plan of 736 project with total 1380 bidding packages.
- Inviting bids 574 has been carried out package (with 655 invitation to bid notice), pre-qualification of 0 package is carried out.
- Results announced of 509 package, cancel the bid for 1 package (among the packages above).
- Yes 11 package with results without TBMT, TBMST.