Laboratory LAS-XD 01.008

Management Unit Info: AN GIANG CONSTRUCTION JOINT STOCK COMPANY

Address before merge
Address after merge 
316/1A Trần Hưng Đạo, Phường Mỹ Long, Thành Phố Long Xuyên, tỉnh An Giang., An Giang
Tax code
1600220016

Laboratory information

Lab Name
Material laboratory and construction components - ACC
Laboratory address before merge
Laboratory address after merge 
Thửa đất số 107, tờ bản đồ số 6, Phường Mỹ Thạnh, Thành Phố Long Xuyên, tỉnh An Giang., An Giang
Lab code
LAS-XD 01.008
Recognition date
Recognition content
The list of testing criteria is eligible for specialized construction activities of LAS-XD 01.008 laboratory including: Mechanical and chemical testing; Testing concrete and heavy concrete mixture; Testing concrete aggregate and mortar; Testing soil mechanics in the room; Testing at the scene; Construction steel testing; Asphalt testing; Bitumen testing; Test mineral powder in asphalt concrete; Testing of construction mortar; Testing baked clay brick mechanics; Testing of self -insertion concrete brick mechanics; Testing concrete bricks; Testing aerated concrete tiles (AAC); Testing cement tiles; Testing natural paving stones and artificial paving stones on the basis of organic adhesive; Terrazzo brick experiment; Testing of reinforced concrete sewer pipes; Rock testing; Testing reinforced concrete box. Technical standards for tests are fully listed, including Vietnamese and foreign standards (if any). When there is a new version of the technical standard to replace the old standard, the corresponding new standard must be applied. This certificate takes 05 years from the date of signing.
Last update
15/07/2025 - First update
You need to Login or Sign up to view all informations.

List of certificates

No. Decision name Certification period
1 Certificate 352/GCN-SXD An Giang

This lab belongs to the contractor. The results of data analysis for contractor AN GIANG CONSTRUCTION JOINT STOCK COMPANY are as follows:

  • Participated in 126 bidding packages, of which 53 were won, 66 were lost, 4 are pending results, and 3 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 48.45% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 91.73% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding: An Giang (98), Đồng Tháp (2), Vĩnh Long (1), Undefined (25)
  • Provinces before the merger where the contractor has participated in bidding: An Giang (97), Đồng Tháp (2), Trà Vinh (1), Kiên Giang (1), Undefined (25)
  • Has relationships with 34 Bid Solicitors
  • Has competed against 206 contractors in 99 bidding packages, won 27 packages, lost 66 packages, 3 are pending results, and 3 were canceled.
  • Has collaborated with 16 contractors in 23 bidding packages, won 10 packages, lost 11 packages, 1 are pending results, and 1 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 0 bidding packages with 0 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This laboratory belongs to the bidding party. The results of data analysis for the bidding party AN GIANG CONSTRUCTION JOINT STOCK COMPANY are as follows:
  • Announced Contractor selection plan of 29 project with total 136 bidding packages.
  • Inviting bids 47 has been carried out package (with 49 invitation to bid notice), pre-qualification of 0 package is carried out.
  • Results announced of 32 package, cancel the bid for 0 package (among the packages above).
  • Yes 0 package with results without TBMT, TBMST.
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second